Page 19 of 185 FirstFirst ... 91617181920212229 ... LastLast
Results 181 to 190 of 1846
  1. #181
    Senior Member
    Join Date
    Dec 2009
    Gender
    Male
    Posts
    831

    Default Re: How far does a 300k budget build a house?


    ^^ bro nhuman na imu blay?share sad sa imu experience...

  2. #182

    Default Re: How far does a 300k budget build a house?

    pwede na a mka himo og bala. depende sa materials...

  3. #183

    Default Re: How far does a 300k budget build a house?

    Quote Originally Posted by reypel View Post
    @necroticfreak: metal truss imu bro?or wood truss?
    wood truss ra bro..

  4. #184
    Senior Member
    Join Date
    Dec 2009
    Gender
    Male
    Posts
    831

    Default Re: How far does a 300k budget build a house?

    ngbutang ka ug anapog sa imy blay bro?

  5. #185

    Default Re: How far does a 300k budget build a house?

    cemento ranang 300k apil sa leveling sa yuta..bcng kuwang pa
    think of it this way:
    1. kelangan kag architect or contractor diba so that ur house will be approved na inhabitable, di raman ikaw ang mgbuot2 ug himog balay ana, kelangan kag permit to build or operate from the city.
    2. how soon would u want to finish your house? kung eputol2 man gud nimu, madaot na imung mga materials daku ang tendency di mahuman ang bay
    3. with the length of time u want to finish your house, that entails hiring the number of people to finish it, ryt? let's say (1) 5 kabuok laborer working 6 days a week nya swelduhan baya na nimug at least P150 each per day. di ra laborer imung kelangan, naa panay tig (2) measure2, (3) naa pud mason, (4) tig semento, (5) tig pintal, (6) electrician para sa mga wiring, (7) plumber or tubero for ur pipe structure and much more.
    4. materials: this entails 50-60% guro sa imung gasto to build a house. (1) cement; (2) sand and gravel pgpatag sa imung yuta OR to fill up weak foundations in the ground; (3) scaffolding (erent ni nimu ky 2 storeys man kaha ang balay -- either puthaw or bamboo scaffolding); (4) water; (5) electricity for the operation of machinery (drills, cement mixers, suga, etc); (6) glass for your windows; (7) lumber (di man pud cemento tanan ang balay); ( tiles (hala kani ky per square feet raba ni); (9) fixtures (lababo, shower or gripo, toilet bowl); (10) hollow blocks; (11) steel bars for ur posts pud (panganvas mong mga materials ug laing butang sa hardwares -- makalibat gyud)
    5. your time (imu na emonitor personally ang pgbuild dili kay once a week ra nimu echeck ky ikaw ray alkansi ana ky imung materiales pwede mailisan ug barat quality materials, pwede pud madaot inig uwan)
    6. damages (in terms of transporting your materials, naa man gyuy mabali, mabuak, madaot..be ready for that gyud)
    Last edited by urbeautychemist; 04-04-2011 at 11:12 AM. Reason: lots of typo errors

  6. #186

    Default Re: How far does a 300k budget build a house?

    300k, pwede ra if gamay nga balay, then dili tanan sementado. 100k, kay semento rana ug kabilya, if gamay ta nga balay imoha epa buhat.

  7. #187

    Default Re: How far does a 300k budget build a house?

    Quote Originally Posted by urbeautychemist View Post
    cemento ranang 300k apil sa leveling sa yuta..bcng kuwang pa
    think of it this way:
    1. kelangan kag architect or contractor diba so that ur house will be approved na inhabitable, di raman ikaw ang mgbuot2 ug himog balay ana, kelangan kag permit to build or operate from the city.
    2. how soon would u want to finish your house? kung eputol2 man gud nimu, madaot na imung mga materials daku ang tendency di mahuman ang bay
    3. with the length of time u want to finish your house, that entails hiring the number of people to finish it, ryt? let's say (1) 5 kabuok laborer working 6 days a week nya swelduhan baya na nimug at least P150 each per day. di ra laborer imung kelangan, naa panay tig (2) measure2, (3) naa pud mason, (4) tig semento, (5) tig pintal, (6) electrician para sa mga wiring, (7) plumber or tubero for ur pipe structure and much more.
    4. materials: this entails 50-60% guro sa imung gasto to build a house. (1) cement; (2) sand and gravel pgpatag sa imung yuta OR to fill up weak foundations in the ground; (3) scaffolding (erent ni nimu ky 2 storeys man kaha ang balay -- either puthaw or bamboo scaffolding); (4) water; (5) electricity for the operation of machinery (drills, cement mixers, suga, etc); (6) glass for your windows; (7) lumber (di man pud cemento tanan ang balay); ( tiles (hala kani ky per square feet raba ni); (9) fixtures (lababo, shower or gripo, toilet bowl); (10) hollow blocks; (11) steel bars for ur posts pud (panganvas mong mga materials ug laing butang sa hardwares -- makalibat gyud)
    5. your time (imu na emonitor personally ang pgbuild dili kay once a week ra nimu echeck ky ikaw ray alkansi ana ky imung materiales pwede mailisan ug barat quality materials, pwede pud madaot inig uwan)
    6. damages (in terms of transporting your materials, naa man gyuy mabali, mabuak, madaot..be ready for that gyud)
    this is a nice input you have here. you have stated the obvious. well, the TS already knew that. thats why he changed the topic not to focus on the 300k thing

  8. #188
    Banned User
    Join Date
    Jan 2008
    Gender
    Male
    Posts
    5,363
    Blog Entries
    9

    Default Re: How far does a 300k budget build a house?

    a contractor costs you at the least 25 percent more.

    if you are smart.
    hire competent workers.
    those you know very well.

    there's an architect here in istorya who just passed the exam.
    maybe he can do it for you for a lot lower budget.

    importante dili ka mag-usab-usab sa imong hunahuna about sa balay while in progress ang construction,
    kay mao nay gasto kaayo.

  9. #189
    Senior Member
    Join Date
    Dec 2009
    Gender
    Male
    Posts
    831

    Default Re: How far does a 300k budget build a house?

    thanks for the input. if we could ask the mods the rename the title so that not to mislead others.

  10. #190

    Default Re: How far does a 300k budget build a house?

    80sq m.... i can design your house free of charge para tabangan lang tika....regarding cost etc... i check sa imo yuta kng agri na cya sa una... kai need ka backfilling! hopefully not, then your 300k would go sa walls and beams. that it...wla pay finish.pero its a good start... im happy for you guys nga naningkamot mo sa imo wifey. lets do with what you have right now... imo lang i pay kai ang labor sa imo tao.3 ka tao ok na.. 1 mason 2 labor
    wishing you a good start in life God bless!!!

  11.    Advertisement

Page 19 of 185 FirstFirst ... 91617181920212229 ... LastLast

Similar Threads

 
  1. For Hire: Budget Friendly Construction Services: Design, Build and Renovate
    By newsprint_kuno in forum Specialty Services
    Replies: 63
    Last Post: 02-26-2017, 11:44 AM
  2. Replies: 11
    Last Post: 10-28-2014, 09:30 AM
  3. Replies: 0
    Last Post: 01-23-2012, 08:19 AM
  4. Replies: 124
    Last Post: 06-08-2010, 11:55 PM
  5. A website for houses, apartments, and rooms for rent in Cebu
    By shutterzoo in forum Websites & Multimedia
    Replies: 3
    Last Post: 05-31-2008, 10:04 PM

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  
about us
We are the first Cebu Online Media.

iSTORYA.NET is Cebu's Biggest, Southern Philippines' Most Active, and the Philippines' Strongest Online Community!
follow us
#top