weh? ipakita imu contract beh... ug walay contract mapakita storbot jud ni klaro.. hahahahhaa
Concerned Citizen:
"Hoy naunsa naman tawn mo oy.....Time Out sa ..Cease fire ..Peace sa"
Dumaguete-Cebu warriors:
" Ayaw sige apil2x diha 'yot..Aaaahh walay peace peace... padayon ang kawsa"
"mangamatay kung mangamatay"
Bwaahahahahahaaa.....Mods tabang,,,i-balhin nani sa Humor Section
@Salbahis: Unsta to dili ka mo tuo sa wikipedia or gapakita ka sa imung kaugalingon na salbahis gyud ka nga tinuod? hehehehe! kani salbahis naa koy lain nga source ayaw napud og igna nga dili na sad ka mo tuo. Lalim pud ba nga ako pud kuno nga mo ingun dili sad ko mo tuo sa imong post. hahahahahaha!
The province?s geothermal power plants supply about 30 percent of the total power consumed in the Cebu-Panay-Negros power grid. While the peak load for the entire grid is estimated at 625 MW, the total grid capacity is only 560 MW. The shortfall, however, has been taken up by the geothermal power plants in the island of Leyte, which supplies the electricity via submarine cable linking Leyte-Cebu-Negros and Panay islands. The addition of 200 MW submarine cables on the Leyte-Cebu interconnection in the near future will further boost power sypply in the grid.
source: Oriental Negros Power Supply
Matud sa akong gi post 30% total power consumed in the CEBU-PANAY-NEGROS! kana salbahis dili na wikipedia ayaw og igna nga dili ka mo tuo ana, kay kung dili ka ako pud dili sad ko mo tuo sa imong gi post. hehehehe! pag sulti lang if ganahan ka og lain nga source salbahis. bwehehehehehehe!
Dia pa salbahis basaha ni pag ayo ni. hehehehe!
The Dumaguete-based cooperative gets power from four (4) substations and one (1) hydroelectric plant with a combined capacity of 45.5 MVA. The largest substation with a combined capacity of 30 MVA is located in Pulantubig, Dumaguete City. The other stations are situated in Tanjay, Siaton, Bayawan and Amlan with capacities of 4.2, 5.0, 5.0 and 1.3 MVA respectively. The hydroelectric plant is located in Amlan. Except for the Amlan substation, all threeutilize a 13.2 KV primary voltage and a 7.62 secondary voltage. NORECO?s present capacity is expected to increase with the ongoing construction of a 3.75 MVA substation in Kalumboyan, Bayawan City and the proposed construction of a 20 MVAA substation in Dumaguete City.
source: Oriental Negros Power Supply
I simply don't understand where all this heat is coming from. *Facepalm*
iSTORYA.net Sitewide Forum Rules
Buy/Sell/Trade/Classifieds Forum Rules
Frequently Asked Questions (FAQ)
The philosophers have only interpreted the world, in various ways. The point, however, is to change it.
Similar Threads |
|