murag kuwang jud ang 300k ts.. and 1m gali na balay ron.. more or less
-1floor
-2 bedrooms
-2 cr's
-small sala
-small dinning area
-front porch/garage (1 car & 1 motor)
murag kuwang jud ang 300k ts.. and 1m gali na balay ron.. more or less
-1floor
-2 bedrooms
-2 cr's
-small sala
-small dinning area
-front porch/garage (1 car & 1 motor)
pwede na mapuyan bro. dli lng nko pintalan and floor tiles. next project na pud na by next year puhon if naay gamay msave after bayad sa mga utang.hehehe
buslot na gyud ako bulsa oi. bulsa sa silingan na nlng gyud ako gkuhaan.hahaha
nindot pud imu gate bro dah. modern nga design.
didto ko nipalit sa new Millenium Hardware bro sa 3/4" nga square tube. ako gamit ky 3/4"x3/4", 1"x2" and 2"x3".
wla pa hinuon nporma ky sa fence pa cla rn ngwelding ako gip una ang perimeter fence. pila na imu decostone?
dako2 na gyud mi ug nagasto ani. sunod ang furnishing nsad. wlay undang gasto.hehehe
magpasalamat sad ko kang Bro monk3y sa iyang services and building materials.
i got the ff from him
electrical wires
wiring devices (switches and outlets)
door lock sets
lighting and fixtures
salamat kaayo sa discounts bro.
if you need building materials pm lng ninyo cya.
repost from other thread, dito pala dapat:
hayzt, kakatake out ko lang nga haus ko sa deca 5, the contractor charge me 80k and here'e the qoutation, goodluck n algn sakin kung makita nya to, hehehe just want some advise, kasi im just a young boy, renovating my deca 5 house. ito na malapit sa grandwall, eto yung binigay nya kagabi, ok lang ba? or i can go lower?
yung 1st floor ko, concrete polish gray cement lang, i dont want tiles p kasi gusto k talaga kahoy but mahal yung kahoy so para presentable and cheap red cement lng muna or gray cement.
Proposed labor cost: 38,000php
Proposed material cost: 42,000php (prize effective only for 1 week upon receiving of quotation).
Total cost: 80,000
Estimated Work timeline : 21 good working days
Scope of Work as follows:
1. Construction of kitchen area and slabs for roofing/second floor provision (per deca model house/show room).
2. Construction of lavatory and installation kitchen cabinets. (lavatory zinc and tiles will be owner supply)
3. Construction of cabinet/rack below staircase.
4. Construction of kitchen cabinet (per deca model house/show room).
5. Construction/division of rooms at second floor (1 room Japanese theme)
6. Installation of vinyl tile second floor. (vinyl tile will be owner supply)
7. Painting of walling and ceiling at ground floor and second floor (interior only)
8. Polishing/coloring of ground floor and kitchen flooring with (gray color)
9. Fabrication of portable island bar (ceramic material will be owner supply)
10. Installation of 3 set steel window per agreed design.
11. Cleaning of working place
Naa koy Lot nga 147 Sq. M.
Triangular lot siya, plano lagi unta nako nga mura ug letter L ang floor.
Basa-basa lang ko diri para naa sad ko idea sa budget. Yeah.
Some Pieces Of Advice, mas makatipid mo if inyo tingbon or kausahon tanan ug palit para maka less mo sa presyo. para sad ma free delivery inyo karga. Sa mga kabilya og cement ato mo palit sa Big Brother. Kung nagplan mo nga ad2 mamalit sa Apo Cement sa San Fernando ayaw na lng kai dili mo maka derecta dito. Big Brother ang pinakabarato so far. Sa roofs sad pangita mo sa Yellow Page sa PLDT kai dira me kita k2ng sa amo(kalimot ko unxa name a2). Ayaw mo agi ug Ahenti kai grabe mamospos sa presyo
mga bro, naa mo advise... unsa material for roofing for flat roofs? kanang gamay ra jud ug slope ba. less than 3 degrees. except lang polycarbonate.
The standard in construction for the labor cost is 30-40% of material cost.
I guess 3 weeks is too long. It can be lowered into 2 weeks since all the scopes ay maliliit lang na trabaho yan but then again kailangan todo supervision mo sa mga workers and it also depend on how many workers will be employed.