  1. #461

    Default Re: House Construction and Renovation


    Mga bro, asa ta makapalit ug precast culvert kanang gagmay nga himoon drainage sa balay?
    TIA.

  2. #462

    Default Re: House Construction and Renovation

    Quote Originally Posted by reypel View Post
    sa inyo construction bro, pila hours ninyo nhuman ug buhos? pila sad manpower imu ghire?
    mga 4pm na nasugdan amo nahuman ug tungang gabii. 8 ra manpower tanan, 2 ra gidungag, mano2 pajud pag masa.. mga 60 sq.m ang coverage area sa slab..

  3. #463

    Default Re: House Construction and Renovation

    d ba sa pag-ibig, by phasing man na ila basehan sa pagpa loan ug house construction?
    start ka sa fence, then poste. then loan ka, roll nimo ang kwarta.

    daghan man nakabuhat ana.

    ayaw lang jud mo ana mga row house. ses, minilyon. tagaktak. ajinomoto

  4. #464
    Senior Member
    Join Date
    Dec 2009
    Gender
    Male
    Posts
    831

    Default Re: House Construction and Renovation

    Quote Originally Posted by necrotic freak View Post
    mga 4pm na nasugdan amo nahuman ug tungang gabii. 8 ra manpower tanan, 2 ra gidungag, mano2 pajud pag masa.. mga 60 sq.m ang coverage area sa slab..

    paspas kau ninyo nhuman nuh. considering 60 sqm with only 10 manpower and wlay mixer.

  5. #465

    Default Re: House Construction and Renovation

    Quote Originally Posted by reypel View Post
    paspas kau ninyo nhuman nuh. considering 60 sqm with only 10 manpower and wlay mixer.
    pinaspasay jud bro.. nipis raman pod ang slab .10m ra kay steel deck man. monolithic pod nuon apil ang beam sa buhos.

  6. #466
    Senior Member
    Join Date
    Dec 2009
    Gender
    Male
    Posts
    831

    Default Re: House Construction and Renovation

    late na ni nga updates

    week 13

    beam reabs are complete. plywood shuttering starts on the beam and slab. the progress was slow due to rains. kng mguwan they have to find shelter pra dli mbasa then go back to work once wla na uwan. i told them be very extra careful coz its slippery. wla bya ta insurance.
    front view




  7. #467
    Senior Member
    Join Date
    Dec 2009
    Gender
    Male
    Posts
    831

    Default Re: House Construction and Renovation

    week 14

    shuttering done
    slab rebar layout is almost complete. the preparation for the slab pour is ready. the stairs for the upper floor where the chain gang tranports the buckets of concrete is already waiting.

    i thought it was just a simple stairs but when i arrived at the site nshock ko sa kadaghan sa kahoy nga nagamit. it would been used to brace the scaffolding and i think naa pa unta sobra nga kahoy. pro its better safe than sorry coz dnha cla mg.agi ang mga tao.

    rebars on one of the rooms



    view from the masters with neighbor's cow at the back, bathroom is lowered 2 inches pra dli msulod ang basa sa master bedroom.



    the rebars fabrication station



    German, one of our assistants carries buckets of water to wash the forms for concrete pouring. look how much wood consumed for the stairs alone. pwerting daghana.

    Last edited by reypel; 08-11-2011 at 11:17 AM.

  8. #468

    Default Re: House Construction and Renovation

    wow nice bro...ig blessing hap ayaw kalimot hahaha...

  9. #469
    Senior Member
    Join Date
    Dec 2009
    Gender
    Male
    Posts
    831

    Default Re: House Construction and Renovation

    Week 15 (Pouring of concrete)

    We started early at 730am after they had breakfast. we hired 20 additional laborers to help us with the pour. plus 6 existing workers and myself so we are 27 all in all. the weather was fine but there were rain clouds so it was expected to have rainshowers. it did rain after lunch but thank God it was not a heavy down pour. the 27 man-team worked from shine to rain to shine again. i thought i could spend 5 hours OT on the pour but we did it in less than 8 hours with the help of some energy drinks( sting & cobra, i hope ill get something by endorsing these hehe). we connected lights in case it'll get dark but wla man magamit.

    the chain gang at work


    2 hours after the job we are already a quarter of the total progress. it must have been the result of the energy drinks.hehehe pagmayroon ka nito wla kang talo!


    During the break, we connected tarps near the mixer in case it'll rain. pero niuwan gyud.


    after 7 hours the chain gang is done with job and 2 of the men does the finishing touches


    Smile Tinoy smile!
    Tinoy of the panday does the brooming of the slab.


    Thank God it was done without any hassles.

  10. #470

    Default Re: House Construction and Renovation

    asa ni dapit brad sa bogo? pila na gastto ana ron?

  11.    Advertisement

Similar Threads

 
  1. For Hire: Budget Friendly Construction Services: Design, Build and Renovate
    By newsprint_kuno in forum Specialty Services
    Replies: 63
    Last Post: 02-26-2017, 11:44 AM
  2. Replies: 11
    Last Post: 10-28-2014, 09:30 AM
  3. Replies: 0
    Last Post: 01-23-2012, 08:19 AM
  4. Replies: 124
    Last Post: 06-08-2010, 11:55 PM
  5. A website for houses, apartments, and rooms for rent in Cebu
    By shutterzoo in forum Websites & Multimedia
    Replies: 3
    Last Post: 05-31-2008, 10:04 PM

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  
about us
We are the first Cebu Online Media.

iSTORYA.NET is Cebu's Biggest, Southern Philippines' Most Active, and the Philippines' Strongest Online Community!
follow us
#top